References

СНПЧ А7 Сургут, обзоры принтеров и МФУ

 

S.N.

PROJECT

SUPPLIER

CLIENT

DATE

1

Supply Power & Instrumentation

Cables

MESK

NORTH OIL COMPANY

2009

2

Rehabilitation of 7 X 37MVA Gas Turbine Units

Siemens/

TURBOCARE/

AEC

MINISTRY OF ELECTRICITY

2009

3

Overall Maintenance,

Commissioning and Startup of

7.5MVA Diesel Engine Power Plant

Wartsila

AL-QAIM CEMENT FACTORY

2010

4

Supply Vented & SLD Batteries

EXIDE

MINISTRY OF ELECTRICITY

2010

5

Supply & Installation of 11KV

Switchgear

ELPA

NORTH OIL COMPANY

2011

6

Rehabilitation of Pumping Station PS3 (Phase1)

Petrofac Mechanical Services

STATE COMPANY FOR OIL PROJECTS

2011

7

Upgrading DCS system

(Software & Hardware)

Schneider

Electric

NORTH OIL COMPANY

2012

8

Supply & Installation of DC

System

PMI

NORTH OIL COMPANY

2012

9

Dismantling,Testing,Overhaul,

Certification and Installation of 115PRV

Petrofac

SHELL MAJNOON

2012

10

ICOEEP

NESSCO

SOUTH OIL COMPANY

2012

11

Supply of 4xMars 100 Gas turbine generator sets

TURBOMACH

AL QAIM POWER STATION

2012

12

Supply Telecom Special Tools

Data & LAN, SDH,  PABX,  PAGA CCTV

Fujikura

W&G JDSU

SHELL MAJNOON

2013

13

Supply & Installation of

Conical type Strainers & Pipe Fittings for Strategic Pipeline

Semac

ConstructionS.A.

STATE COMPANY FOR OIL PROJECTS

2013

14

Supply, Installation and

Calibration of Field Instruments, Actuators and Valves

EIM-Emerson,

UnitedElectric, andAssco

STATE COMPANY FOR OIL PROJECTS

2013

15

Rehabilitation of Pumping Station PS3 (Phase2)

Petrofac

Mechanical Services

STATE COMPANY FOR OIL PROJECTS

2013

16

Supply, Installation &

Commissioning of Compressed Air Package

CompAir

STATE COMPANY FOR OIL PROJECTS

2013

17

Supply & Installation

Gas Turbine Air Intake System

AAF

STATE COMPANY FOR OIL PROJECTS

2013

18

Supply, Installation &

Commissioning of Zero Overhaul LM2500 GE unit

TS&S

SOUTH OIL COMPANY

2014

19

Installation & Commissioning

Custody Transfer Metering System

KROHNE

OIL AND GAS BV

BASRA GAS COMPANY

2014

20

Supply & Installation

Cables & Accessories for West Qurna Water Injection Project

Nexans

 

STATE COMPANY FOR OIL PROJECTS

2014

21

Supply of 3500 racks and

transducers for the BP IRAQ Rumela-ROOSCADASystem

GE BN

BP-KOREK ENGINEERING SYSTEMS

2014

22

Supply & Installation of Instrument Air Plant. (Two electrically driven + two mobile diesel driven air compressors, air & water cooled & dryers)

BLUTEK

MIDLAND OIL COMPANY

2015

23

Top Drive Auxiliary Service Loop Cables

Nexans AmerCable

IRAQI DRILLING COMPANY

2015

24

Supply Power & Control Cables and Wires

Nexans

 

MIDLAND REFINERIES COMPANY

2015

25

Installation, Commission, start-up and Test-Run of skids A & B Fuel Gas booster compressor

Howden

SHELLMAJNOON

2015

26

Telecom Package & 3 years’ Service Contract

NESSCO

SHELL MAJNOON

Ongoing

27

Major Overhaul LM2500 GE unit (Dismantling, Overhauling, Installation and Start-up)

TS&S

SOUTH OIL COMPANY

Ongoing

28

New Pumping Stations (Two Turbo Pump Units + BOP)

EPC Contract

ZUBAIR/2 DEPOT(SOC)

Ongoing

29

Telecom & Pipeline Leak

Detection System (PLDS)

Commissioning and startup

KROHNE

OIL AND GAS

BV

PETRONAS CARIGALI IRAQ

HOLDINGB.V.

Ongoing

30

Supply, modification, Installation, commissioning & startup of Valves & Actuators for Pumping Station-PS3

Emerson

EIM Actuators

STATE COMPANY FOR OIL PROJECTS

Ongoing