SUPPLY, INSTALLATION & COMMISSIONING OF ZERO OVERHAUL LM2500 GE TURBO GENERATOR UNIT
CLIENT: BASRA OIL COMPANY (BOC)
LOCATION: ZUBAIR 1 DEPOT
REHABILITATION OF TWO TURBO‐PUMPS
CLIENT: STATE COMPANY FOR OIL PROJECTS (SCOP)
LOCATION: PUMPING STATION 3 (PS3)‐ NAJAF
SUPPLY INSTALLATION, COMMISSION AND START‐UP OF THREE AIR COMPRESSOR UNITS, INTEGRATED AS AIR COMPRESSION PLANT
CLIENT: MIDDLE OIL COMPANY (MDOC)
LOCATION: MDOC ‐ BAGHDAD
COMMISSIONING AND START‐UP OF THREE INSTRUMENT AIR COMPRESSORS AND TWO DRYERS
CLIENT: KUWAIT ENERGY
LOCATION: SIBA OIL FIELD
INSTALLATION OF TWO KROHNE CUSTODY GAS METERING SKIDS, INCLUDING INSTALLATION OF SKIDS WITH THE FIELD INSTRUMENTATION AND VALVES, CABLING, INSTALLATION OF A CONTROL CABINET, COMMISSIONING AND START‐UP
CLIENT: BASRAH GAS COMPANY (BGC)
LOCATION: BASRAH
COMMISSIONING AND START UP OF TWO ELECTRICAL SUBSTATIONS
CLIENT: WOOD GROUP‐ EXXONMOBIL
LOCATION: WEST QURNA OILFIELD
COMMISSIONING AND START‐UP OF KROHNE PIPELINE LEAK DETECTION SYSTEM INCLUDING INTEGRATION WITH HONEYWELL DCS SYSTEM FOR 11 KM PIPELINE WITH TWO LBV STATIONS