SUPPLY, INSTALLATION & COMMISSIONING OF ZERO OVERHAUL LM2500 GE TURBO GENERATOR UNIT

CLIENT: BASRA OIL COMPANY (BOC)

LOCATION: ZUBAIR 1 DEPOT



REHABILITATION OF TWO TURBO‐PUMPS

CLIENT: STATE COMPANY FOR OIL PROJECTS (SCOP)

LOCATION: PUMPING STATION 3 (PS3)‐ NAJAF

 


SUPPLY INSTALLATION, COMMISSION AND START‐UP OF THREE AIR COMPRESSOR UNITS, INTEGRATED AS AIR COMPRESSION PLANT

CLIENT: MIDDLE OIL COMPANY (MDOC)

LOCATION: MDOC ‐ BAGHDAD



COMMISSIONING AND START‐UP OF THREE INSTRUMENT AIR COMPRESSORS AND TWO DRYERS

CLIENT: KUWAIT ENERGY

LOCATION: SIBA OIL FIELD



INSTALLATION OF TWO KROHNE CUSTODY GAS METERING SKIDS, INCLUDING INSTALLATION OF SKIDS WITH THE FIELD INSTRUMENTATION AND VALVES, CABLING, INSTALLATION OF A CONTROL CABINET, COMMISSIONING AND START‐UP

CLIENT: BASRAH GAS COMPANY (BGC)

LOCATION: BASRAH



COMMISSIONING AND START UP OF TWO ELECTRICAL SUBSTATIONS

CLIENT: WOOD GROUP‐ EXXONMOBIL

LOCATION: WEST QURNA OILFIELD



COMMISSIONING AND START‐UP OF KROHNE PIPELINE LEAK DETECTION SYSTEM INCLUDING INTEGRATION WITH HONEYWELL DCS SYSTEM FOR 11 KM PIPELINE WITH TWO LBV STATIONS

CLIENT: PETRONAS

LOCATION: GARRAF



EPC CONTRACT TWO TURBO PUMP FOR ZUBAIR 2 DEPOT

CLIENT: BASRA OIL COMPANY (BOC)

LOCATION: ZUBAIR 2



SUPPLY, AND INSTALLATIONS OF SOLAR T130 GAS TURBINE, IN BASRAH, PS1.

CLIENT: BASRA OIL COMPANY (BOC)

LOCATION: BASRAH



SUPPLYING, COMMISSIONING, AND START UP BLUTEK AIR COMPRESSOR DRIVEN BY DRESSER-RAND STEAM TURBINE.

CLIENT:SOUTH REFINERIES COMPANY (SRC).

LOCATION: BASRAH